Ownership and land documents
The first thing any authority checks is that the person applying actually owns the plot, and that the land can be built on. For land in a village or town survey area this is usually the 7/12 extract (satbara utara). In city survey areas it is usually the property card. Alongside it you will need the document that shows how you came to own the land, such as the registered sale deed, and in many cases the index copy of that registration.
If the land was agricultural, you will also need the NA (non-agricultural) order that allows it to be used for building. Check that the area, survey number and owner names match across every paper. A small mismatch here is the most common reason a file is sent back.
- Latest 7/12 extract or property card, in the applicant's name
- Registered sale deed, and index copy where asked for
- NA order and its conditions, where the land was agricultural
- Approved layout or plot plan, if the plot is part of a scheme or society
- Power of attorney or consent letters, if someone else is applying or there are joint owners
Key takeaway
Get fresh copies of your land records and check that names, survey numbers and areas match before anything else.
Drawings and technical certificates
The drawings are the heart of the application. They must be prepared and signed by a registered engineer or architect, and they have to show that the building follows the GDCR for your zone: setbacks from the plot boundary, permitted FSI, height, parking, open space and so on. A typical set includes a site plan, floor plans, sections and elevations, with an area statement that shows how the built-up area was worked out.
Along with the drawings, the authority will usually ask for a structural stability certificate from a qualified structural engineer, confirming that the building has been designed to stand safely. Depending on the size and use of the building, other certificates or clearances may also be needed. Your authority will tell you which apply to your case.
- Site plan showing the plot, road width and setbacks
- Floor plans, sections and elevations to scale
- Area statement and FSI calculation
- Structural stability certificate from a structural engineer
- Signed declarations from the owner and the registered professional
Key takeaway
Drawings that already follow the GDCR for your zone are what keep an application from going round in circles.
Photos, ID and fees
Most applications also ask for recent photographs of the site, so the authority can see its current condition and what is around it. You will need the owner's identity proof, and sometimes address proof, in the format the online system accepts.
There is a scrutiny or application fee, and later other charges depending on the building, which are paid online as part of the process. We do not quote fee amounts here because they depend on the authority, the plot and the building, and they are revised from time to time. The online system or your local office will show the exact amount for your file.
- Recent site photographs
- Owner ID proof, and address proof if asked for
- Fee payment through the online system
- Scanned copies in the format and file size the portal accepts
How the online application fits together
In broad terms, the registered engineer or architect creates the application on the online system, uploads the drawings and documents, and the owner confirms it. The authority then scrutinises the file, may ask questions or request changes, and may inspect the site. Once everything is in order, permission is issued and can be downloaded.
Because the professional who signs the drawings is part of the application, the quality of the drawings matters as much as the papers. If the authority raises a query, it usually goes back to the person who prepared the file. That is why we stay with the application until the permission is in your hands.
Key takeaway
Treat approval as a stage of the project, not a formality. Plan for it before you fix a start date on site.

