Six clear stages. Most clients stop after permission and build with their own contractor. If you want us to build or supervise, the last stage is there.
Most of a project is decided on paper. Select any stage to see what it produces and who is responsible for it.
We see the plot, hear the brief and settle the plan before anything is drawn in detail.
3D, working drawings and permission. Most clients finish here and build with anyone they like.
Only if you want it: we build under one contract, or supervise your contractor as your PMC.
We visit your plot, take measurements, note the road side, levels and orientation, and listen to what you need.
We visit your plot, take measurements, note the road side, levels and orientation, and listen to what you need.
Two or three layout options, compared and refined with you until the plan works for your family or business.
Your elevation and interiors in 3D, so colours, materials and details are decided on screen instead of on site.
Dimensioned architectural, structural and services drawings that a contractor can build from without guessing.
Submission drawings and documents prepared to the rules, filed online, and followed up until approval.
Only if you want it: we build it ourselves under one contract, or supervise your contractor as your PMC.
Every stage issues something. Nothing here is generated at the end to look thorough - it is the record made while the work was happening.
Any contractor can follow a plan when everything goes right. What a documented process is for is the week it doesn't.
Have a project question?
Direct guidance from UCS engineers.
Discuss feasibility, timeline estimation, or municipal clearances for your site.
We establish what you're building, why, and what constraints already exist - site, budget, timeline, approvals. The output is an agreed scope, which everything after it is measured against. It's a working conversation rather than a pitch.
Scope, a preliminary budget and a realistic programme, before design work starts. Doing it in that order means every decision afterwards is made against a plan rather than a guess, and it's the stage where an unrealistic date is cheapest to identify.
Estimation follows design and engineering, so it prices something specific rather than an idea. That's also when long-lead procurement items are identified. The estimate distinguishes what's known from what's allowed for - particularly on renovation, where some of the scope is genuinely unknown until work starts.
Against the baseline programme, with progress measured weekly. Trades are sequenced so they aren't working over each other, and slippage is reported while there's still time to recover it rather than explained afterwards.
Yes - it's stage six, with its own inspections and sign-offs, and it runs throughout rather than only at the end. Records are compiled as work proceeds, which is what makes completion documentation possible without a scramble at handover.
Each of the seven stages has defined deliverables, a responsible team and a key output - an agreed scope, a programme, a drawing set, an estimate, and so on. The process page sets out all seven so you can see what arrives when.
Consultation, drawings and cost estimation resolved before breaking ground on your site.